Summary
The Kochi metro requires 17 additional train rakes to support its proposed extensions to Kakkanad and the airport. These rakes are necessary to maintain a train frequency of six to seven minutes on the 11.20-km Pink Line to Kakkanad and the subsequent 19-km airport extension.